Friday, November 4, 2011

Production Schedule


Production Schedule
Production Company- Lightning productions                                   Date: 11/11/2010
Director: Louis Paule,Sertan Vedat, Dipika Barber, Funda Demir                  
Crew: Louis Paule, Dipika Barber, Sertan Vedat and Funda Demir
Pre-production:
The Pitch- To be done by every member (Louis, Funda, Dipika and Sertan).  This refers  to the group presenting our opening sequence idea to others and getting feedback on it.  16/09/2011
Proposal- Louis will do this. This consists of a description on the content of the opening sequence and the purpose of it. 23/09/2011
Treatment- to be done by Funda. Includes details on props or facilities that will be needed. Along with different sounds, camera shots and facial expressions used. 23/09/2011
Audience profile- will be completed by Dipika, explaining a profile on the primary target audience and the secondary target audience. 23/09/2011
 Resources for Mise-en-scene- to be done by Sertan, this has details on the location, props, costumes and lighting that will be used. 23/09/2011
 Textual analysis- will be done by everyone (Louis, Funda, Sertan and Dipika) is the analysis of a movie with a similar genre. 30/09/2011
 Script- to be done by Sertan and Louis, specifying what each character would say in each sequence.
Shot List- will be done by Louis and Sertan explaining what each shot will consist of e.g. shot size,angle and what’s happening. 30/09/2011
Draft Poster- Will be done by Louis, Dipika and Sertan, drawing and stating ideas for potential film poster for our film. 30/09/2011
Annotation of film poster- To be completed by Louis, Dipika, Sertan and Funda, analysing the poster that we used for our textual Analysis. 30/09/2011
Recce Report- to be done by Dipika, explaining details on the location including pictures and why it’s suitable.   07/10/2011
Storyboard- To be done by Louis, which will include drawings of each shot that is included in the shot list. 07/10/2011
Risk Assessment- This will be completed by Dipika, assessing possible hazards that may occur when filming. 07/10/2011
Annotation of film reviews- Layout:Dipika, Louis and Sertan to analyse and explain three different reviews, looking at the font, language etc. Content: To be done by all members looking at reviews from the films we used for our textual Analysis 07/10/2011

Filming Days:
11 October 2011: Student As Journey and Students filming each other
13 October 2011: Jim’s Journey and filming the lrc scene and the classrooms and canteen scene.
14 October 2011:  Student Bs journey and students around college.
20 October 2011: Opening scene and the final scenes.



Post Production:
Log and Transfer= 4/11/2011
Short film rough cut: 4/11/2011
Draft magazine review: 11/11/2011
Final draft poster: 18/11/2011
Short film second cut: 25/11/2011
Final Draft magazine page: 02/12/2011
Final draft evaluation: 09/12/2011
Final cut of short film: 09/12/2011




No comments:

Post a Comment